Once the regeneration process is done the pressure build up in the vessel is started by closing the purge valves. After reaching the operating pressure the air flow is changed from the adsorbing vesel to the freshly regenerated vessel. Adsorption now commences in the freshly regenerated vessel, while the other vessel enters its regeneration cycle.
Technical Data of Adsorption Dryer DRYBERG
Capacity* [m3/m]
3,5
Capacity* [m3/h]
210
Connection [inch]
1"
Dimensions (AxBxCxD) [mm]
1543x853x745x650
Weight [kg]
212
Calculated at 1 bar (abs.) and 20°C at 7 bar g operating pressure and 35°C compressed air inlet temperature (saturated condition)